MV SEAPACE
Blt March 2010 Taizhou Sanfu for present Owners
Class ABS SS due 3/2020, Last DD 7/2019
Abt 56.894 mts on 12.8m
33.036 GT/19.270 NT
5 HO/HA, abt 71.500 cbm grain cap
4x31 mtons cranes, 4 Peiner Smag 14cbm electrohydraulic grabs
STX MAN B+W 6S50MC-C7 Main Engine, 11.603 bhp NCR
3 Generators
(WATER BALLAST TREATMENT PLANT (TECH CROSS) INSTALLED 7/19)
(all details are abt and wog)
Blt March 2010 Taizhou Sanfu for present Owners
Class ABS SS due 3/2020, Last DD 7/2019
Abt 56.894 mts on 12.8m
33.036 GT/19.270 NT
5 HO/HA, abt 71.500 cbm grain cap
4x31 mtons cranes, 4 Peiner Smag 14cbm electrohydraulic grabs
STX MAN B+W 6S50MC-C7 Main Engine, 11.603 bhp NCR
3 Generators
(WATER BALLAST TREATMENT PLANT (TECH CROSS) INSTALLED 7/19)
(all details are abt and wog)